Conceptual & Detailed Design:
From initial layouts to full structural detailing for slabs, beams, and foundations

Software-Based Modeling:
Using ADAPT, RAM Concept, ETABS, and AutoCAD for accurate analysis and simulation

Code Compliance:
Designs aligned with Dubai Municipality, BS, ACI, and EN standards

Design Coordination:
Seamless integration with architectural and MEP disciplines

Design Supervision & Review:
On-site support and technical validation during execution

Service Benefits

  • Optimized load distribution and structural integrity
  • Reduced material usage and construction costs
  • Faster approvals through code-compliant documentation
  • Enhanced safety and long-term durability
  • Flexibility for complex architectural forms

Highest Expectations with Ferrigor

Ferrigor offers comprehensive structural design services that ensure strength, safety, and compliance across a wide range of post-tensioned structures. From concept to execution, our designs meet the highest expectations in efficiency, accuracy, and integration. Leveraging advanced software tools and adhering to Dubai Municipality, BS, ACI, and EN standards, we deliver solutions that balance performance with cost-effectiveness.

What Can Ferrigor Support With?

  • Conceptual & Detailed Structural Design for slabs, beams, and foundations

  • Advanced Modeling & Simulation using ADAPT, RAM Concept, ETABS, and AutoCAD

  • Code-Compliant Documentation for faster approvals

  • Design Coordination with architectural and MEP disciplines

  • On-Site Design Supervision & Technical Review

  • Optimized Load Distribution for material savings and structural integrity

Technical Insights in Post-Tension Reporting and Cost Control

Worksite safety in post-tensioning is non-negotiable. Key risk zones include:

  • Tendon Handling
    Ensure correct lifting methods and secure storage. Avoid sharp bends or damage to sheaths.
  • Stressing Zones
    Create exclusion areas during tensioning. Only authorized personnel with PPE should be present.
  • Concrete Curing Areas
    Monitor temperatures and humidity to prevent tendon slippage or anchorage misalignment.

Implement safety inductions, stress zone barricades, and full PPE protocols.

Cost control in post-tensioning construction involves:

  • Tendon and Anchor Procurement
    Bulk ordering with certified suppliers to reduce lead times.
  • Labor and Equipment Budgeting
    Allocate for skilled PT technicians, stressing jacks, and grouting pumps.
  • Subcontractor Coordination
    Integrate MEP, formwork, and rebar subcontractors to avoid costly site delays.

Use cost tracking tools to monitor material usage, labor hours, and equipment rentals.

To begin a post-tension slab or beam project:

  1. Structural Design Review: Ensure compatibility with UAE building codes.
  2. Tendon Layout Drawing: Mark slab or beam areas with correct duct spacing.
  3. Formwork and Rebar Inspection: Verify clearances before duct placement.
  4. Tensioning and Grouting Sequence: Follow approved method statements for stressing.

Coordinate with structural consultants, site engineers, and PT suppliers.

Post-tensioning quality assurance involves:

  • Elongation Reports
    Compare theoretical vs. actual elongation values.
  • Grout Integrity Testing
    Conduct bleed and strength tests after injection.
  • Anchorage Zone Inspections
    Ensure anchorage and bursting reinforcement are installed correctly.

Track quality benchmarks using PT logs, slab deflection monitoring, and third-party testing.

Efficient scheduling improves cost efficiency and build speed:

  • Tendon Delivery & Storage
    Allow buffer time based on import lead times.
  • Installation & Stressing Phases
    Match with concrete pour dates and curing schedules.
  • Inspection & Grouting
    Plan QA/QC hold points with consultants.

Use critical path method (CPM) tools and weekly look-ahead programs.

  • Safety First
    Identify lifting hazards and maintain exclusion zones in stressing areas.
  • Commercial Focus
    Budget for high-precision equipment and certified materials.
  • Stakeholder Alignment
    Synchronize design engineers, procurement teams, and project managers.
  • Quality Monitoring
    Use digital logs and on-site QA teams for real-time updates.
  • Smart Scheduling
    Prevent delays through phased tendon installation and inspection milestones.

Reporting Tips:

  • Maintain elongation and grouting logs per pour zone.
  • Document all stressing operations with photos and torque values.

Scheduling Tips:

  • Align tendon laying with slab casting timelines.
  • Allow minimum curing before initial stressing (per Dubai Municipality standards).