logo

Build Smarter with Ferrigor – Post-Tensioning Experts

Ferrigor delivers advanced post-tensioning systems for high-rise towers, podium slabs, and infrastructure projects. Our solutions reduce material costs, enable longer spans, and accelerate construction timelines.

We Offer:

image

Get in touch

+97145761193

M-22, Sky Business Center, Dubai Festival City, Dubai, UAE

Expert Post-Tensioning Solutions – Contact Us

Precision Engineering Starts with a Conversation

Looking for expert guidance on post-tensioning systems, PT slab design, or structural strengthening? Our Dubai-based engineering team is ready to deliver customized solutions that meet your project’s technical and budgetary needs.

Fill out the form below, and we'll respond with precision-engineered recommendations tailored to your structure.

Bio Image

FERRIGOR

  • Address:

    M-22, Sky Business Center, Dubai Festival City, Dubai, UAE

  • Telephone:

    Tel: +97 14 57 61 193

  • Email:

    info@ferrigor.com

Heading Icon
Frequently asked question

Smart Solutions for Your Post-Tensioning Needs in Dubai

Post-tensioning is a structural reinforcement technique where high-strength steel tendons are tensioned after concrete has cured. This method enhances the load-bearing capacity, reduces cracking, and allows for longer spans—making it ideal for Dubai’s high-rise buildings, bridges, and podium slabs.

Post-tensioned slabs offer :

  1. Cost-effective construction
  2. Reduced cracking and deflection
  3. Longer spans with fewer columns

These benefits are especially valuable in commercial towers, parking structures, and residential podiums where space and efficiency are critical.

The post-tensioning process includes :

  1. Installing ducts and tendons before concrete pouring
  2. Pouring and curing the concrete
  3. Stressing tendons using hydraulic jacks
  4. Locking the tension with anchors
  5. Grouting (for bonded systems) to protect against corrosion

  • Bonded System: Tendons are grouted after stressing, creating a permanent bond with the concrete. Ideal for bridges, heavy slabs, and infrastructure.
  • Unbonded System: Tendons remain free inside plastic sheathing, allowing flexibility. Common in residential buildings and slab-on-grade applications.

Yes. When designed and installed according to Dubai Municipality and international standards, post-tensioned systems are extremely safe and long-lasting. Regular inspections and stress monitoring ensure structural integrity for decades.

Dubai, UAE

Address: FERRIGOR PRESTRESSED CONCRETE CONTRACTING L.L.C S.O.C
Tel: +971 45761193
Email: info@ferrigor.com

World Map