Design Review & Optimization:
Reassessing slab thickness, tendon layouts, and anchorage zones for cost-effective performance
Material Efficiency:
Minimizing concrete and steel usage through smart engineering
Construction Simplification:
Streamlining installation processes to reduce labor and time
Lifecycle Cost Analysis:
Evaluating long-term savings through reduced maintenance and extended durability
Collaborative Engineering Support:
Working with stakeholders to align structural goals with budget constraints
Ferrigor delivers cost-effective value engineering solutions that optimize structural performance without compromising safety or quality. Our approach focuses on smart design, material efficiency, and lifecycle cost savings, ensuring every post-tensioned structure meets the highest expectations in durability, speed, and sustainability. We align engineering excellence with budget-conscious strategies to maximize project value.
Design Optimization for slabs, tendons, and anchorage zones
Material Efficiency to reduce concrete and steel usage
Simplified Construction Processes for faster execution
Lifecycle Cost Analysis for long-term savings
Collaborative Engineering with stakeholders to meet budget goals
Compliance Assurance with Dubai Municipality and international standards
Worksite safety in post-tensioning is non-negotiable. Key risk zones include:
Implement safety inductions, stress zone barricades, and full PPE protocols.
Cost control in post-tensioning construction involves:
Use cost tracking tools to monitor material usage, labor hours, and equipment rentals.
To begin a post-tension slab or beam project:
Coordinate with structural consultants, site engineers, and PT suppliers.
Post-tensioning quality assurance involves:
Track quality benchmarks using PT logs, slab deflection monitoring, and third-party testing.
Efficient scheduling improves cost efficiency and build speed:
Use critical path method (CPM) tools and weekly look-ahead programs.
Reporting Tips:
Scheduling Tips: