Anchored Retaining Walls:
Designed to resist lateral earth pressure in basements and cuttings

Slope Stabilization Systems:
Post-tensioned anchors to prevent soil movement and landslides

Excavation Support:
Temporary and permanent anchoring for deep foundation works

Corrosion-Protected Tendons:
Durable materials for long-term performance

Installation & Stressing:
Precision execution with hydraulic jacking and load testing

Compliance:
Adhering to BS, EN, and Dubai Municipality geotechnical standards

Service Benefits

  • Enhanced safety in deep excavation zones
  • Increased stability for retaining structures
  • Reduced risk of soil failure and settlement
  • Long-term durability in harsh environments
  • Cost-effective alternative to traditional shoring methods

Highest Expectations with Ferrigor

Ferrigor provides reliable post-tension ground anchoring systems for deep excavations, retaining walls, and slope stabilization. Our solutions are engineered to meet the highest expectations in safety, soil stability, and long-term structural integrity. With full compliance to BS, EN, and Dubai Municipality geotechnical standards, we ensure every anchoring system performs under the most demanding site conditions.

What Can Ferrigor Support With?

  • Custom Anchoring Designs for retaining walls and slope stabilization

  • Excavation Safety Solutions for temporary and permanent works

  • Corrosion-Protected Tendons for long-term durability

  • Precision Installation & Load Testing using hydraulic jacking systems

  • Compliance Assurance with international and local geotechnical codes

  • Cost-Effective Alternatives to traditional shoring and support methods

Technical Insights in Post-Tension Reporting and Cost Control

Worksite safety in post-tensioning is non-negotiable. Key risk zones include:

  • Tendon Handling
    Ensure correct lifting methods and secure storage. Avoid sharp bends or damage to sheaths.
  • Stressing Zones
    Create exclusion areas during tensioning. Only authorized personnel with PPE should be present.
  • Concrete Curing Areas
    Monitor temperatures and humidity to prevent tendon slippage or anchorage misalignment.

Implement safety inductions, stress zone barricades, and full PPE protocols.

Cost control in post-tensioning construction involves:

  • Tendon and Anchor Procurement
    Bulk ordering with certified suppliers to reduce lead times.
  • Labor and Equipment Budgeting
    Allocate for skilled PT technicians, stressing jacks, and grouting pumps.
  • Subcontractor Coordination
    Integrate MEP, formwork, and rebar subcontractors to avoid costly site delays.

Use cost tracking tools to monitor material usage, labor hours, and equipment rentals.

To begin a post-tension slab or beam project:

  1. Structural Design Review: Ensure compatibility with UAE building codes.
  2. Tendon Layout Drawing: Mark slab or beam areas with correct duct spacing.
  3. Formwork and Rebar Inspection: Verify clearances before duct placement.
  4. Tensioning and Grouting Sequence: Follow approved method statements for stressing.

Coordinate with structural consultants, site engineers, and PT suppliers.

Post-tensioning quality assurance involves:

  • Elongation Reports
    Compare theoretical vs. actual elongation values.
  • Grout Integrity Testing
    Conduct bleed and strength tests after injection.
  • Anchorage Zone Inspections
    Ensure anchorage and bursting reinforcement are installed correctly.

Track quality benchmarks using PT logs, slab deflection monitoring, and third-party testing.

Efficient scheduling improves cost efficiency and build speed:

  • Tendon Delivery & Storage
    Allow buffer time based on import lead times.
  • Installation & Stressing Phases
    Match with concrete pour dates and curing schedules.
  • Inspection & Grouting
    Plan QA/QC hold points with consultants.

Use critical path method (CPM) tools and weekly look-ahead programs.

  • Safety First
    Identify lifting hazards and maintain exclusion zones in stressing areas.
  • Commercial Focus
    Budget for high-precision equipment and certified materials.
  • Stakeholder Alignment
    Synchronize design engineers, procurement teams, and project managers.
  • Quality Monitoring
    Use digital logs and on-site QA teams for real-time updates.
  • Smart Scheduling
    Prevent delays through phased tendon installation and inspection milestones.

Reporting Tips:

  • Maintain elongation and grouting logs per pour zone.
  • Document all stressing operations with photos and torque values.

Scheduling Tips:

  • Align tendon laying with slab casting timelines.
  • Allow minimum curing before initial stressing (per Dubai Municipality standards).